Sign In | Join Free | My himfr.com |
|
Ask Lasest Price | |
Brand Name : | QRZ |
Model Number : | Preliminary design drawings |
Price : | ¥75-¥750 |
Payment Terms : | D/P, T/T |
Supply Ability : | 1 |
Delivery Time : | 15-20 working days |
Preliminary design drawings:
1. Design instructions: Design instructions for various
specialties, as well as specialized content for energy conservation
and fire protection design. (Optional)
2. Drawings: Design drawings for various specialties, including
architecture, structure, process, electrical control, HVAC, fire
protection, water supply and drainage, etc. (Professional optional)
3. List: List of Main Materials and Equipment.
4. Estimate: Professional calculation sheet. (Optional)
What the customer needs to provide:
1. Planning Red Line
2. Feasibility study and approval documents
3. Environmental impact assessment and approval documents
4. Scope, level of content detail, and other requirements
5. Equipment and instrument brand requirements
6. Time requirements
What we provide to customers:
1. Provide drawing versions of various professional design
instructions and document versions of overall design instructions
(optional)
2. Responsible for designing various specialties to meet the
preliminary design requirements of the owner
3. Provide drawings for various specialties (optional specialties,
detailed content can be found in the instructions)
4. Provide a drawing version list and a table version list
(optional)
5. Provide a budget estimate (optional).
Delivery time and delivery form:
1. 5-8 working days.
2. CAD+document+table.
Fee standard:
1. A2 drawing costs 300 yuan per sheet as the benchmark value
(scale 1:100).
2. Craft, architecture/structural specialties are calculated based
on benchmark values.
3. The electrical automation profession is calculated based on a
benchmark value of 0.7.
4. At the same ratio, A1 is calculated as 1.5 * A2, and A0 is
calculated as 2.5 * A2.
5. Under the same ratio, A3 is calculated as 0.5 * A2, and A4 is
calculated as 0.25 * A2.
6. Convert according to different proportions.
7. Other majors will be negotiated separately based on specific
needs and market prices.
8. The estimated cost shall be executed in accordance with Article
5 of the instructions.
![]() |