Provide process technical support:
1. Includes basic information, design scale, water composition and
discharge pattern, water quality of each stream, discharge
requirements, and other requirements.
2. Including design standards, design principles, analysis of water
quality and treatment characteristics, process comparison and
determination of process routes (responsible for meeting the
owner's requirements), detailed process flow diagrams and
explanations, and a list of removal rates for each process unit.
3. Includes a list of structures and equipment for each unit.
4. General instructions for structure, architecture, electrical and
self-control, material selection, anti-corrosion, and insulation
methods.
5. Including labor safety measures, fire protection measures, and
construction schedule bar chart.
6. According to the needs, cost accounting for civil engineering,
equipment, installation and commissioning, detailed breakdown and
summary prices based on customer feedback, analysis of operating
costs, main indicators such as land area, installed operating
power, and daily electricity consumption, elevation flow chart, and
preliminary overall layout.
Service standards:
Prepare reports and report files that meet the depth requirements
of the environmental impact assessment documents, with content that
meets the requirements of laws and regulations, technical
standards, design specifications, and other documents, to ensure
the smooth passing of the environmental impact assessment review.
What the customer needs to provide:
1. Approval of construction unit information, project approval,
feasibility study, planning and site selection, and water and
electricity.
2. Product category and scale, production process and reaction
mechanism, equipment name and model, material consumption and
output.
3. Project land acquisition and dismantling, construction and
production plan.
4. The total quantity control requirements approved by clean
production and regulatory authorities.
Plan duration and delivery format:
1. Contract signing - expert review approval time, adjusted based
on project size, product types, expansion and renovation,
complexity and sensitivity.
2. Environmental Impact Assessment Report Form: 20-30 days.
3. Environmental impact assessment report: 75-180 days.
4. PDF electronic version.
Fee standard:
Collect according to the market situation of environmental impact
assessment. Report table: 20000 to 40000 yuan, report book: 150000
to 300000 yuan, the price will be determined on a case by case
basis based on project scale, product types, complexity and
sensitivity, regional characteristics, etc.
![]() |