Sign In | Join Free | My himfr.com |
|
Ask Lasest Price | |
Brand Name : | QRZ |
Model Number : | environmental assessment |
Price : | ¥5000-¥15000 |
Payment Terms : | D/P, T/T |
Supply Ability : | 1 per week |
Delivery Time : | 5-8 working days |
Provide process technical support:
1. Includes basic information, design scale, water composition and
discharge pattern, water quality of each stream, discharge
requirements, and other requirements.
2. Including design standards, design principles, analysis of water
quality and treatment characteristics, process comparison and
determination of process routes (responsible for meeting the
owner's requirements), detailed process flow diagrams and
explanations, and a list of removal rates for each process unit.
3. Includes a list of structures and equipment for each unit.
4. General instructions for structure, architecture, electrical and
self-control, material selection, anti-corrosion, and insulation
methods.
5. Including labor safety measures, fire protection measures, and
construction schedule bar chart.
6. According to the needs, cost accounting for civil engineering,
equipment, installation and commissioning, detailed breakdown and
summary prices based on customer feedback, analysis of operating
costs, main indicators such as land area, installed operating
power, and daily electricity consumption, elevation flow chart, and
preliminary overall layout.
Service standards:
1. Provide process comparison and determine the process route
2. Provide a detailed flowchart and supporting main instructions
3. Responsible for ensuring that the process meets the owner's
requirements
4. Provide equipment list
5. Provide all dimensions of buildings and structures
6. Provide main indicators such as land occupation, investment,
freight, and electricity consumption.
7. Detailed equipment list, preliminary layout drawings, etc.
What the customer needs to provide:
1. Project location, design scale, water quantity composition and
discharge pattern, and water quality of each water stream (some
water require water quality laboratory data) and other operating
conditions. Provide completion drawings for various specialties of
the existing sewage station, reasons for renovation/existing
problems, actual inflow and outflow water quantity and quality,
process and equipment operation status for renovation.
2. Emission/reuse standard requirements and other requirements from
the competent department and the owner (including water, gas,
slag/mud).
3. The terrain, land area, surrounding environment, size, and water
inflow and outflow direction of the available site can be utilized.
4. The general budget concept of the owner (optional), their
preference for investment and operating costs, equipment brand,
pool structure, and requirements for self-control.
5. Recommended or preferred process by the owner (optional)
6. Preliminary project materials (environmental impact assessment,
feasibility study, etc.)
7. Time requirements;
8. The requirements of the construction unit for construction
period, water quantity calculation, water quality monitoring, power
distribution and self-control, commissioning and trial operation.
9. Conditions and directions for water, electricity, gas, and
communication access/exit.
10. Customer's own introduction materials, etc. (if needed by the
customer).
Plan duration and delivery format:
1. 5-8 working days.
2. PDF electronic version.
Fee standard:
1. 5000 to 15000 yuan.
2. Charge 0.2% of the total project investment. The fees for the
5000 to 15000 range above will be calculated based on actual costs.
Fees will be charged based on the first two standards for items
below or exceeding.
3. Calculate separately for special or complex processes.
4. The renovation project will be increased by 5-20% based on the
above foundation.
![]() |