Sign In | Join Free | My himfr.com |
|
Ask Lasest Price | |
Brand Name : | QRZ |
Model Number : | Construction drawings |
Price : | ¥350-¥5000 |
Payment Terms : | D/P, T/T |
Supply Ability : | 1 per week |
Delivery Time : | 10-90 working days |
Provide process technical support:
Drawings: Design drawings for various specialties, including
architecture, structure, process, electrical control, HVAC, fire
protection, water supply and drainage, etc. (Professional optional)
Drawing content:
1. Architectural drawings include cover, table of contents, design
specifications, overall layout, individual floor plans, elevations,
sections, and structural details.
2. Content of structural drawings: cover, table of contents, design
specifications, overall layout, floor plans and cross-sections of
each building, structural drawings of beams, slabs, columns, pool
walls, and bottom plates, detailed drawings of each component,
reinforcement table, etc.
3. Process drawing content: cover, table of contents, design
specifications, building layout plan, equipment layout plan,
instrument layout plan, pipeline layout plan, elevation process/PID
process/process flow diagram, section/elevation diagram,
axonometric drawing (construction drawing), partial installation
detailed drawing (construction drawing), material list, equipment
and instrument list, etc.
4. Electrical self-control drawing content: cover, table of
contents, design description, floor plan (cabinet box layout,
bridge layout, power wiring, self-control wiring, lightning
protection, grounding, lighting, etc.), load calculation table, IO
table, cabinet/box drawing, schematic diagram, self-control system
diagram, equipment material list, etc.
5. Other professional drawings: executed according to professional
requirements.
Service standards:
1. Depth: For municipal engineering projects, the preliminary
design documents meet their depth requirements; For non municipal
projects, the depth shall be based on the preliminary design
documents of municipal public works. 2. Time: Complete the
preliminary design within the specified time. 3. Quality: The
content is comprehensive and in-depth, with the latest standards,
regulations, and laws adopted. The process and design parameters
are in line with the actual water quality of the project, and the
structural building electrical design meets the process and actual
operational requirements; There are no mandatory clauses that
violate mandatory requirements such as "should, must, and should
not". 4. Cost: Meet the depth and quality requirements of design
budget preparation; Cost and cost fully consider market conditions
and customer needs. 5. Provide drawing versions of various
professional design descriptions
6. Responsible for designing various specialties to meet the
construction requirements of the owner
7. Provide drawings for each specialty (optional for each
specialty)
8. Provide a list of drawing versions
9. Provide a budget proposal (optional).
What the customer needs to provide:
1. Planning the red line
2. Feasibility study and approval documents
3. Environmental impact assessment and approval documents
4. Preliminary design and approval documents
5. Scope, pool structure, implantation equipment or process units,
level of content detail, and other requirements
6. Brand requirements/models/data/drawings for equipment and
instruments
7. Time requirements
Plan duration and delivery format:
1. Delivery time: 10-90 working days
2. Delivery form: Delivery of PDF drawings
Fee standard:
1. The starting fee is 10000 yuan.
2. Charge 1-3% of the total investment according to the plan. Fees
below 2 million yuan are charged at 3%; 2-5 million, charged at
2.5%; 5-10 million, charged at 2.0%; 10 to 30 million yuan, charged
at 1.5%, and over 30 million yuan charged at 1.0%; Set a complexity
coefficient of 0.7-2.0 for difficulty and adjust the charging ratio
based on the project.
3. Calculate separately for special or complex processes.
4. The renovation project will be increased by 5-20% based on the
above foundation.
5. The construction drawing budget is calculated based on market
prices.
![]() |